Customization: | Available |
---|---|
Type: | Infrared Sensor Switch |
Principle: | Infrared |
Still deciding? Get samples of US$ 12.27/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PIR Sensor Switch, for lights (ABR-302C)
1, L/N inputs
2, For all types of loads
3, Energy-saving
4, Delay time: 16s-350s
Features:
1. Auto ON and Auto OFF with a delay of 16 seconds to 30 seconds (custom settings available).
2. Operates on L&N line inputs;
3. Ambient-light override option (no switching lights ON when there's sufficient sunlight), and the override level can be set by the user;
4. Auto ON and Auto OFF with a delay that can be set by the user from 16 seconds to 350 seconds;
5. Good for all types of loads;
6. Wallplate uses flame resistance ABS-V0 material for safety;
7. Classical 86 series design, and easy installation.
Specifications: | |||
Voltage | 220~240V(50Hz/60Hz) | Operating temperature | 0C~30C |
Maximum Wattage | 2200W | Relative humidity | Non-condensing 20-90% |
Working distance | 5-7m | ||
Installation hole spacing | 60mm | Matching wall box | 75*75*50mm |
Dimension | 86*86*23mm | Weight | 72g |
Wiring Diagram and Installation Guide:
BRT-302C occupancy sensor switch require both hot wire and neutral wire for installation:
Hot wire (ACL): Coming from the power line with 220V;
Neutral wire (ACN): Usually coming with the hot wire; and
Load wires: Going to the load.
3 shows the wiring diagram and Fig. 4 shows the step-by-step installation instructions. There are three easy steps:
Step one: Use a screwdriver to pry off the front plate in position A;
Step two: Wiring according to the diagram and the labelled ports of the switch; and
Step three: Install screws and front plate.